Electrical Testing for
Safe Energisation

Protection, transformer, switchgear, cable, earthing and battery testing, tailored to your equipment, protection philosophy and project specifications.

Why we test

Prove it works, record it, track it

Verify

Installation and protection performance confirmed before energisation.

Baseline

Measurements recorded to guide ongoing maintenance.

Assess

Insulation, switching mechanisms and asset condition assessed to support operational decisions.

Insulation condition across your asset base Insulation resistance, polarisation index, dielectric loss angle (tan delta) and partial discharge testing on transformers, instrument transformers, switchgear, breakers, switchboards and cables, where applicable.
Electrical testing

From high voltage to protection relays

We test the full chain, from HV cables and transformers through switchgear and instrument transformers to the protection relays that trip the breaker. Open a group to see the test scope.

HV cablesInsulation, sheath, joints and terminations
AssetTest scope
HV cablesVery Low Frequency (VLF) withstand, sheath integrity, tan delta, insulation resistance, polarisation index where suitable, online and offline partial discharge
Power transformersInsulation, windings, tap-changers and oil-paper
AreaTest scope
InsulationInsulation resistance, polarisation index, tan delta and capacitance, online and offline partial discharge
WindingsVector group, HV/LV winding resistance, turns ratio, excitation current
Tap-changersDynamic resistance during on-load tap-changer operation
Winding integrityShort-circuit impedance, leakage reactance, Sweep Frequency Response Analysis (SFRA)
Oil-paperDielectric response (DIRANA), dissolved gas and furan analysis
Switchgear, circuit breakers and switchboardsHV and LV
AssetTest scope
HV switchgearInsulation resistance, power-frequency withstand, contact resistance, breaker timing, undervoltage and shunt-trip coil pickup/dropout, interlocks
HV and LV circuit breakersInsulation, power-frequency withstand, polarisation index, contact resistance and timing, static/dynamic measurements, tan delta and partial discharge where applicable
LV switchgear and trip unitsInsulation and contact resistance, interlocks, trip-unit pickup/dropout, long-time, short-time, instantaneous and earth-fault timing as fitted
HV and LV switchboardsFunctional and interlock testing of controls, protection, metering, indications and alarms; online and offline partial discharge
Instrument transformersCurrent and voltage transformers, HV and LV
AssetTest scope
Current transformersRatio and polarity, magnetisation curve and knee point, winding resistance, insulation diagnostics
Voltage transformersRatio, polarity and winding resistance, insulation diagnostics
Protection relays and schemesFrom relay element to breaker trip
AssetTest scope
Protection relaysPickup/dropout and timing by secondary injection; primary injection through CT circuits, relay logic and breaker tripping
Breaker protection integrationOn-board relay setup to approved settings, verified by primary and secondary injection
Transformer protectionThrough-fault stability: CT polarity, ratio and phase compensation, relay wiring and restraint
Bus-zone protectionPrimary-injection stability: CT polarity, zone allocation, current summation and trip logic
Earthing and DC supply systemsEarth grids and protection battery supplies
AssetTest scope
Earthing systemsSoil resistivity, earth-grid impedance, step and touch potential
DC power and battery systemsBattery commissioning checks; battery-bank discharge load testing
Pre-installation testingEquipment tested on site before it is installed and energised
EquipmentTest scope
Protection relays and trip unitsPickup/dropout, timing and logic by secondary injection, with approved settings applied
Instrument transformersRatio, polarity, magnetisation curve and winding resistance
Circuit breakers and mechanismsInsulation and contact resistance, contact timing, operating-sequence checks
Settings and functional verificationChecked against approved settings and drawings, with results recorded as baseline measurements
How we work

How every test job runs

All testing is carried out in the field, on your site, so faults are found before energisation, not after.

  1. Before work startsScope and test plan agreed

    Test methods, applied values and acceptance criteria confirmed with you in writing.

  2. Before installationEquipment pre-tested on site

    Relays, trip units, CTs and breakers checked on arrival, before they are installed.

  3. Before energisationTested to approved settings

    Protection set and proven against your approved settings, from primary injection to breaker trip.

  4. At handoverResults recorded as a baseline

    Measurements documented for commissioning sign-off and future condition assessment.

Every scope is checked against
  • Manufacturer instructions
  • Approved drawings
  • Project specifications
  • Applicable standards

Discuss the scope





    Equipment to test



    Drawings or equipment list (PDF, DWG, Excel or ZIP, max 10 MB each)



    More files? Put them in one ZIP, or email them to info@biigenergy.com.au

    Why Choose Us

    Reliable Services Backed by Trusted Professionals.

    Reliable Services Backed by Trusted Professionals.
    Expert Technicians

    Our certified engineering team provides technical knowledge and precision for end-to-end electrical asset management.

    Guaranteed Quality

    Every system is rigorously tested and built to deliver exceptional durability and full AS/NZS compliance.

    Affordable Pricing

    Optimized production workflows allow us to provide premium industrial solutions with guaranteed competitive pricing.

    Support

    We deliver dedicated technical confidence with responsive engineering support before and after project delivery.